FREE Audit for Licensed Commercial Facilities Above 10,000 Sq. Ft.
Professional on-site assessment to identify issues affecting your yields.
Powered by Athena®
What Our Advisors Will Check
Our facility advisors arrive with professional-grade equipment and systematic protocols to identify issues that could be costing you yield. Here's what gets measured, tested, and analyzed during your audit.
Equipment & Calibration
We verify how often you're calibrating your pH/EC meters (especially critical for Dosatron racks) and take readings at your batch tanks versus what's actually reaching your plants in the grow rooms. Most facilities are shocked by the difference. We'll recommend Athena batch tank labels for ongoing bi-weekly validation if you don't have a monitoring system in place.
Environmental Conditions
Using professional PAR meters, we measure light intensity at plant level - not where your fixtures are hanging. We map temperature, humidity, and CO₂ levels throughout different sections of your facility, then use anemometers to identify stagnant air pockets where problems typically develop.
Plant-Level Testing
This is where most facilities discover their biggest surprises. We test substrate EC and moisture directly from your plants' root zones, not runoff water. Then we compare what your plants are actually receiving versus what you think you're feeding them. The gap between these numbers often explains yield inconsistencies.
Irrigation & Storage
We analyze your irrigation strategy—timing, frequency, and volume—to identify potential over/underwatering issues. We also inspect how you're storing Athena products and identify any competitor products currently in use, since storage conditions directly affect nutrient stability and we need to understand your complete system.
.avif)
What You Get
After your facility audit, you'll receive concrete deliverables designed to help you implement improvements and maintain optimal growing conditions.
Written report with specific findings and prioritized fixes based on actual measurements from your facility
Trial products (if applicable) with detailed explanation of benefits over current solutions
Professional labels for ongoing monitoring and quality control
Direct contact access to your facility advisor for follow-up questions and technical support
Check-in scheduled at 10-14 days to assess trial results and answer implementation questions
Minimum Qualification Criteria
This audit is designed for serious commercial operations ready to implement facility improvements. We're selective about who receives these assessments to ensure maximum value for both parties.
Commercial cultivation license - Must be an active, licensed commercial cannabis operation
10,000+ sq ft flowering canopy - Minimum facility size to justify comprehensive assessment
Key personnel present - Head grower, nutrient mixer, and decision maker must attend the full audit

FAQs
Common questions about our facility audit process and what to expect during your assessment.
The on-site assessment takes 3-4 hours. This includes meeting with your team, equipment testing, environmental measurements, substrate analysis, and reviewing findings with key personnel.
Our advisors arrive with professional-grade equipment including PAR meters for light measurement, anemometers for airflow testing, Solus meters for substrate analysis, and calibrated pH/EC meters for cross-validation of your existing equipment.
No. This audit is designed to help optimize your facility regardless of which nutrients you currently use. If we identify areas where Clean Line or Cleanse products could benefit your operation, we'll provide trial samples, but there's no obligation to purchase.
Your head grower (who handles daily operations), whoever mixes your nutrients, and the decision maker for facility purchases must attend. If your DOC, cultivation manager, or fertigation manager is a different person, they should also be present.
You'll receive a detailed written report with specific findings and prioritized recommendations. We'll provide any applicable trial products and professional labeling materials. A follow-up check-in is scheduled for 10-14 days to assess results and answer questions.
The audit is completely free with no contracts or commitments required. Travel fees may apply if your facility is more than 100 miles from a major city.